LEED-NC Version 2.2 Registered Project Checklist
Cherokee Studios, Los Angeles, CA
Yes |
? |
No |
|
|
13 |
|
1 |
Sustainable Sites |
14 points |
Y |
|
|
Prereq 1 Construction Activity Pollution Prevention |
Required |
1 |
|
|
Credit 1 Site Selection |
1 |
1 |
|
|
Credit 2 Development Density & Community Connectivity |
1 |
|
|
1 |
Credit 3 Brownfield Redevelopment |
1 |
1 |
|
|
Credit 4.1 Alternative Transportation, Public Transportation Access |
1 |
1 |
|
|
Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms |
1 |
1 |
|
|
Credit 4.3 Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles |
1 |
1 |
|
|
Credit 4.4 Alternative Transportation, Reduced Parking Capacity |
1 |
1 |
|
|
Credit 5.1 Site Development, Protect or Restore Habitat |
1 |
1 |
|
|
Credit 5.2 Site Development, Maximize Open Space |
1 |
1 |
|
|
Credit 6.1 Stormwater Design, Reduced Runoff Quantity |
1 |
1 |
|
|
Credit 6.2 Stormwater Design, Treatment of Runoff |
1 |
1 |
|
|
Credit 7.1 Heat Island Effect, Non-Roof |
1 |
1 |
|
|
Credit 7.2 Heat Island Effect, Roof |
1 |
1 |
|
|
Credit 8 Light Pollution Reduction |
1 |
Yes |
? |
No |
|
|
3 |
|
2 |
Water Efficiency |
5 points |
1 |
|
|
Credit 1.1 Water Efficient Landscaping, Reduce Water Use by 50% |
1 |
|
|
1 |
Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation |
1 |
|
|
1 |
Credit 2 Innovative Wastewater Technologies |
1 |
1 |
|
|
Credit 3.1 Water Use Reduction, 20% Reduction |
1 |
1 |
|
|
Credit 3.2 Water Use Reduction, 30% Reduction |
1 |
Yes |
? |
No |
|
|
14 |
|
2 |
Energy and Atmosphere |
17 points |
Y |
|
|
Prereq 1 Fundamental Commissioning of the Building Energy Systems |
Required |
Y |
|
|
Prereq 2 Minimum Energy Performance Required
|
Required |
Y |
|
|
Prereq 3 Fundamental Refrigerant Management Required |
Required |
10 |
|
|
Credit 1 Optimize Energy Performance |
1-10 |
2 |
|
|
Credit 2 On-Site Renewable Energy |
1-3 |
1 |
|
|
Credit 3 Enhanced Commissioning |
1 |
|
|
1 |
Credit 4 Enhanced Refrigerant Management |
1 |
|
|
1 |
Credit 5 Measurement & Verification |
1 |
1 |
|
|
Credit 6 Green Power |
1 |
Yes |
? |
No |
|
|
7 |
|
6 |
Materials & Resources |
13 points |
Y |
|
|
Prereq 1 Storage & Collection of Recyclables |
Required |
|
|
1 |
Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof |
1 |
|
|
1 |
Credit 1.2 Building Reuse, Maintain 100% of Existing Walls, Floors & Roof |
1 |
|
|
1 |
Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements |
1 |
1 |
|
|
Credit 2.1 Construction Waste Management, Divert 50% from Disposal |
1 |
1 |
|
|
Credit 2.2 Construction Waste Management, Divert 75% from Disposal |
1 |
|
|
1 |
Credit 3.1 Materials Reuse, 5% |
1 |
|
|
1 |
Credit 3.2 Materials Reuse,10% |
1 |
1 |
|
|
Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) |
1 |
1 |
|
|
Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) |
1 |
1 |
|
|
Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionally |
1 |
1 |
|
|
Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionally |
1 |
|
|
1 |
Credit 6 Rapidly Renewable Materials |
1 |
1 |
|
|
Credit 7 Certified Wood |
1 |
Yes |
? |
No |
|
|
13 |
|
2 |
Indoor Environmental Quality |
15 points |
Y |
|
|
Prereq 1 Minimum IAQ Performance Required
|
Required |
Y |
|
|
Prereq 2 Environmental Tobacco Smoke (ETS) Control Required
|
Required |
|
|
1 |
Credit 1 Outdoor Air Delivery Monitoring
|
1 |
1 |
|
|
Credit 2 Increased Ventilation
|
1 |
1 |
|
|
Credit 3.1 Construction IAQ Management Plan, During Construction
|
1 |
1 |
|
|
Credit 3.2 Construction IAQ Management Plan, Before Occupancy
|
1 |
1 |
|
|
Credit 4.1 Low-Emitting Materials, Adhesives & Sealants
|
1 |
1 |
|
|
Credit 4.2 Low-Emitting Materials, Paints & Coatings
|
1 |
1 |
|
|
Credit 4.3 Low-Emitting Materials, Carpet Systems
|
1 |
1 |
|
|
Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products
|
1 |
|
|
1 |
Credit 5 Indoor Chemical & Pollutant Source Control
|
1 |
1 |
|
|
Credit 6.1 Controllability of Systems, Lighting
|
1 |
1 |
|
|
Credit 6.2 Controllability of Systems, Thermal Comfort
|
1 |
1 |
|
|
Credit 7.1 Thermal Comfort, Design
|
1 |
1 |
|
|
Credit 7.2 Thermal Comfort, Verification
|
1 |
1 |
|
|
Credit 8.1 Daylight & Views, Daylight 75% of Spaces
|
1 |
1 |
|
|
Credit 8.2 Daylight & Views, Views for 90% of Spaces |
1 |
Yes |
? |
No |
|
|
5 |
|
|
Innovation & Design Process |
5 points |
1 |
|
|
Credit 1.1 Innovation in Design: Biodiesel for Construction Vehicles |
1 |
1 |
|
|
Credit 1.2 Innovation in Design: Exemplary Performance in Alt Transportation |
1 |
1 |
|
|
Credit 1.3 Innovation in Design: Nontoxic Pest Control |
1 |
1 |
|
|
Credit 1.4 Innovation in Design: Exemplary Performance on EQ 8.2 |
1 |
1 |
|
|
Credit 2 LEED® Accredited Professional 1 |
1 |
Yes |
? |
No |
|
|
55 |
|
13 |
Project Totals (pre-certification estimates) |
69 points |
Certified 26-32 points / Silver 33-38 points / Gold 39-51 points /
Platinum 52-69 points